Survey in Saudi
Home chevron_right Mega Projects chevron_right Al-Arbaeen Lake Development – Dredging
Under Construction Project #101
anchor Dredging & Land Reclamation

Al-Arbaeen Lake Development – Dredging

Dredging and environmental remediation of 350,000 cubic meters of lake bed silt to deepen and revitalize water circulation.

corporate_fare
Client
Ministry of Culture & Jeddah Municipality
construction
Contractor
Specialized Marine Dredging Contractors
location_on
Location
Al-Arbaeen Lagoon, Jeddah
schedule
Timeline
Active Dredging 2025-2026
payments
Est. Value
Major Environmental Remediation Project

description Project Overview

Employs cutter suction dredgers (CSD) outfitted with environmental silt curtains and real-time turbidity sensors to remove accumulated organic sediments, improving marine ecology and preparing stable seabed foundations for public promenades.

engineering Technical Specifications

check_circle
dredged volume
350,000 m³
check_circle
equipment
Cutter Suction Dredger with Silt Curtains
check_circle
goal
Ecological Water Flushing

satellite_alt Survey & Geomatics Relevance

Projects of this scale and category typically require comprehensive surveying disciplines including:

  • chevron_right Pre/Post Dredge Hydrographic Surveys
  • chevron_right Navigation Channel Bathymetry (Chart Datum)
  • chevron_right Structural Condition Surveys (Berths & Quays)
  • chevron_right Sedimentation Monitoring & Volume Calculation
  • chevron_right Tidal Benchmark Establishment

Project At a Glance

corporate_fare
Client
Ministry of Culture & Jeddah Municipality
construction
Contractor
Specialized Marine Dredging Contractors
location_on
Location
Al-Arbaeen Lagoon, Jeddah
schedule
Timeline
Active Dredging 2025-2026
domain
Category
Dredging & Land Reclamation
payments
Value Estimate
Major Environmental Remediation Project
Project Status
Under Construction
arrow_back Back to All Projects