Under Construction Project #1
oil_barrel Offshore Oil & Gas

CRPO 154 – Safaniya Field Expansion

EPCI of water injection tie-in platforms, wellhead jackets, 5 km of 24-inch subsea pipeline, and 15 km of subsea composite power cables.

corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Safaniya Offshore Field, Arabian Gulf
schedule
Timeline
Active EPCI Phase (2024-2027)
payments
Est. Value
High-Value Multi-Year EPCI

description Project Overview

Contract Release Purchase Order (CRPO) 154 covers comprehensive engineering, procurement, construction, and installation (EPCI) at the world's largest offshore conventional oilfield, Safaniya. The project deploys automated water injection infrastructure to maintain reservoir pressure, accompanied by 24-inch subsea pipelines and heavy-duty marine electrical cables.

engineering Technical Specifications

check_circle
pipeline length
5 km
check_circle
pipeline diameter
24-inch
check_circle
power cable length
15 km
check_circle
structure type
Water injection tie-in platforms & wellhead jackets
check_circle
concession
Safaniya Field

satellite_alt Survey & Geomatics Relevance

Projects of this scale and category typically require comprehensive surveying disciplines including:

  • chevron_right Multibeam Swath Bathymetry (IHO S-44 Order 1a)
  • chevron_right Sub-Bottom Profiling & Seabed Geophysics
  • chevron_right Pipeline Route Surveys & As-Built Verification
  • chevron_right ROV-Assisted Structural Inspection
  • chevron_right Metocean & Tidal Station Monitoring

Project At a Glance

corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Safaniya Offshore Field, Arabian Gulf
schedule
Timeline
Active EPCI Phase (2024-2027)
domain
Category
Offshore Oil & Gas
payments
Value Estimate
High-Value Multi-Year EPCI
Project Status
Under Construction