Berri & Abu Safah Pipeline EPCI
Dedicated 32-month project executing pipeline trenching, laying, and topside brownfield tie-ins.
corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Berri & Abu Safah Fields
schedule
Timeline
32-Month Duration
payments
Est. Value
Strategic Pipeline Award
description Project Overview
Executed under tight offshore schedules, this EPCI contract installs high-spec subsea pipelines connecting offshore satellite platforms to the main Berri and Abu Safah separation complexes, using specialized pipelay barges and ROV pre-trenching.
engineering Technical Specifications
check_circle
duration
32 Months
check_circle
contractor
Saipem
check_circle
method
S-Lay Pipelay & Post-Trenching
satellite_alt Survey & Geomatics Relevance
Projects of this scale and category typically require comprehensive surveying disciplines including:
- chevron_right Multibeam Swath Bathymetry (IHO S-44 Order 1a)
- chevron_right Sub-Bottom Profiling & Seabed Geophysics
- chevron_right Pipeline Route Surveys & As-Built Verification
- chevron_right ROV-Assisted Structural Inspection
- chevron_right Metocean & Tidal Station Monitoring
Project At a Glance
corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Berri & Abu Safah Fields
schedule
Timeline
32-Month Duration
domain
Category
Offshore Oil & Gas
payments
Value Estimate
Strategic Pipeline Award
Project Status
Under Construction