Survey in Saudi
Home chevron_right Mega Projects chevron_right CRPO 165 – Marjan Field Subsea Interventions
Under Construction Project #7
oil_barrel Offshore Oil & Gas

CRPO 165 – Marjan Field Subsea Interventions

12-month contract for precision subsea interventions, diverless repairs, and EPC of 300 meters of onshore pipeline tie-in.

corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Marjan Offshore Field & Tanajib Coast
schedule
Timeline
12-Month Execution Contract
payments
Est. Value
Specialized Subsea Intervention Award

description Project Overview

Saipem secured CRPO 165 to perform deep subsea structural repairs, umbilical inspections, and spool piece tie-ins at the Marjan field, as well as the EPC installation of a 300m landfall pipeline section connecting offshore feeds into onshore header manifolds.

engineering Technical Specifications

check_circle
contract duration
12 Months
check_circle
onshore pipeline
300 m
check_circle
focus
Subsea Intervention, Tie-in, Pipeline EPC

satellite_alt Survey & Geomatics Relevance

Projects of this scale and category typically require comprehensive surveying disciplines including:

  • chevron_right Multibeam Swath Bathymetry (IHO S-44 Order 1a)
  • chevron_right Sub-Bottom Profiling & Seabed Geophysics
  • chevron_right Pipeline Route Surveys & As-Built Verification
  • chevron_right ROV-Assisted Structural Inspection
  • chevron_right Metocean & Tidal Station Monitoring

Project At a Glance

corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Marjan Offshore Field & Tanajib Coast
schedule
Timeline
12-Month Execution Contract
domain
Category
Offshore Oil & Gas
payments
Value Estimate
Specialized Subsea Intervention Award
Project Status
Under Construction
arrow_back Back to All Projects