Under Construction
Project #18
oil_barrel
Offshore Oil & Gas
Marjan Crude Oil Increment Project
Designed to add 300,000 barrels per day of Arabian Medium crude oil production capacity.
corporate_fare
Client
Saudi Aramco
construction
Contractor
Saudi Aramco / Global EPC Tier-1s
location_on
Location
Marjan Offshore Field
schedule
Timeline
Full Ramp-Up 2026-2027
payments
Est. Value
Multi-Billion Capital Project
description Project Overview
Specifically targeted to boost crude extraction by 300,000 bpd alongside 2.5 billion standard cubic feet per day (BSCFD) of associated gas and 360,000 bpd of C2+ NGL, processed through advanced cryogenic units.
engineering Technical Specifications
check_circle
crude capacity
+300,000 bpd Arabian Medium
check_circle
gas processing
2.5 BSCFD
check_circle
ngl recovery
360,000 bpd
satellite_alt Survey & Geomatics Relevance
Projects of this scale and category typically require comprehensive surveying disciplines including:
- chevron_right Multibeam Swath Bathymetry (IHO S-44 Order 1a)
- chevron_right Sub-Bottom Profiling & Seabed Geophysics
- chevron_right Pipeline Route Surveys & As-Built Verification
- chevron_right ROV-Assisted Structural Inspection
- chevron_right Metocean & Tidal Station Monitoring
Project At a Glance
corporate_fare
Client
Saudi Aramco
construction
Contractor
Saudi Aramco / Global EPC Tier-1s
location_on
Location
Marjan Offshore Field
schedule
Timeline
Full Ramp-Up 2026-2027
domain
Category
Offshore Oil & Gas
payments
Value Estimate
Multi-Billion Capital Project
Project Status
Under Construction