Survey in Saudi
Home chevron_right Mega Projects chevron_right Marjan Field – 300m Onshore Pipeline EPC
Under Construction Project #31
oil_barrel Offshore Oil & Gas

Marjan Field – 300m Onshore Pipeline EPC

300 m onshore pipeline construction and tie-in package forming a key scope element of CRPO 165.

corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Tanajib Coastal Strip
schedule
Timeline
12-Month Schedule
payments
Est. Value
Part of CRPO 165

description Project Overview

Critical shore approach and beach crossing scope linking offshore pipelines landing through HDD (Horizontal Directional Drilling) conduits directly into the Tanajib gas-oil separation manifolds.

engineering Technical Specifications

check_circle
length
300 m
check_circle
method
Shore approach tie-in & civil anchoring
check_circle
parent crpo
CRPO 165

satellite_alt Survey & Geomatics Relevance

Projects of this scale and category typically require comprehensive surveying disciplines including:

  • chevron_right Multibeam Swath Bathymetry (IHO S-44 Order 1a)
  • chevron_right Sub-Bottom Profiling & Seabed Geophysics
  • chevron_right Pipeline Route Surveys & As-Built Verification
  • chevron_right ROV-Assisted Structural Inspection
  • chevron_right Metocean & Tidal Station Monitoring

Project At a Glance

corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Tanajib Coastal Strip
schedule
Timeline
12-Month Schedule
domain
Category
Offshore Oil & Gas
payments
Value Estimate
Part of CRPO 165
Project Status
Under Construction
arrow_back Back to All Projects