Under Construction
Project #14
oil_barrel
Offshore Oil & Gas
Safaniya Oilfield Facilities Expansion
EPCI awards for multiple associated wellheads, electrical distribution platforms, and subsea power cable infrastructure.
corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Safaniya Offshore Concession
schedule
Timeline
Phased Deployment 2025-2028
payments
Est. Value
Billion-Dollar Scale Program
description Project Overview
Comprehensive multi-package expansion designed to sustain Safaniya's maximum sustainable production capacity of 1.3 million barrels per day through cutting-edge artificial lift systems and modern wellhead platforms.
engineering Technical Specifications
check_circle
field
Safaniya
check_circle
sustainable capacity
1.3 Million bpd
check_circle
scope
Wellheads, Power Hubs, Subsea Cables
satellite_alt Survey & Geomatics Relevance
Projects of this scale and category typically require comprehensive surveying disciplines including:
- chevron_right Multibeam Swath Bathymetry (IHO S-44 Order 1a)
- chevron_right Sub-Bottom Profiling & Seabed Geophysics
- chevron_right Pipeline Route Surveys & As-Built Verification
- chevron_right ROV-Assisted Structural Inspection
- chevron_right Metocean & Tidal Station Monitoring
Project At a Glance
corporate_fare
Client
Saudi Aramco
construction
Contractor
Saipem
location_on
Location
Safaniya Offshore Concession
schedule
Timeline
Phased Deployment 2025-2028
domain
Category
Offshore Oil & Gas
payments
Value Estimate
Billion-Dollar Scale Program
Project Status
Under Construction